Notification

Icon
Error

New Topic Post Reply
zhangxiaosan
#1 Posted : Monday, February 12, 2018 2:58:07 AM(UTC)
Quote
zhangxiaosan

Rank: Advanced Member

Groups: Registered
Joined: 1/12/2016(UTC)
Posts: 2,429

<P>Moisture content of the floor, if the installation is not in place, there will be deformation. Because the air is very dry, in the 30 to 60 days of construction period, the floor potential dry crack, deformation and other issues will be exposed. Laying the floor in winter, special attention should be given to the construction of appropriate gaps, the floor should be around 2 mm expansion joints, or prone to drums, dangling phenomenon.</P>
<P>In addition, in the case of geothermal, we must pay attention to step by step to heat the floor. Before installation, the concrete floor temperature should be gradually increased by 5 �� every day until it reaches about 18 �� so far. In the first 3 days after the installation is completed, to maintain this temperature, after 3 days can be warmed up as needed. Can not heat up too fast, otherwise the floor may crack due to bulging distortion phenomenon.</P>
<P>Sometimes in winter there will be rapid heating and rapid cooling. Experts suggest that room should be avoided suddenly warming, especially in the geothermal opening and closing process to be gradual, the temperature rise and fall will affect the service life of wood flooring.</P> "wood deck over gravel base,stringer spacing for composite steps,capping the ends of composite decking "
Quick Reply Show Quick Reply
Users browsing this topic
Guest (3)
New Topic Post Reply
Forum Jump  
You can post new topics in this forum.
You can reply to topics in this forum.
You can delete your posts in this forum.
You can edit your posts in this forum.
You cannot create polls in this forum.
You can vote in polls in this forum.

Powered by YAF 1.9.6 RC1 | YAF © 2003-2018, Yet Another Forum.NET
This page was generated in 0.094 seconds.

Copyright © 2012 Loftygolf.com